Preparation Before Skirting Installation

May 29, 2021

The construction site must meet the installation conditions of the skirting line. Generally, the baseboard installation is carried out after the wall, floor, door cover, and window cover are installed; if the indoor furniture is made or customized, it must be installed after the large non-movable furniture is finished. For example, set-top wardrobes, entrance cabinets, storage cabinets, etc. In this way, the furniture is installed first, which can not only fit closely to the wall, but also save a lot of skirting materials. If the wall is to be covered with wallpaper or wall covering, the aluminum alloy skirting can be installed after the wall is paved, so that the wallpaper or wall covering at the bottom edge can be pressed to be more compliant with the wall. After the indoor site meets the conditions for installing the skirting, clean the dust on the wall. If there is an uneven wall, it must be smoothed before construction.